Anson Engine Museum
Anson Engine Museum Gallery
Home
Login
Anson Engine Museum
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favorites
Search
Home
>
Archive photos of engines and museum views
>
Construction Work up to 2007
Most viewed - Construction Work up to 2007
getting to grips with the Campbell
2038 views
the engine had to be dismantled in the car park prior to its move to a new location
prior to the move
1954 views
the engine had to be dismantled in the car park prior to its move to a new location
Trees being removed to widen the driveway
1951 views
Trees down the drive need to be taken down to widen the area
1944 views
More stone ready for flattening
1843 views
One of the "Friends" of the museum, Jimmy Jackson donated money to allow us buy more stone for the car park.
Preparing the foundations
1824 views
Work on widening the drive and entrance area before new surface laid
1654 views
crank case being lifted off
1590 views
the engine had to be dismantled in the car park prior to its move to a new location
Campbell Engine being reassembled outside museum entrance
1589 views
The flywheel being lowered into place.
More stone waiting to be laid
1587 views
One of the "Friends" of the museum, Jimmy Jackson donated money to allow us buy more stone for the car park.
Another delivery of concrete for the floors arrives
1585 views
The concrete for the floor had to be laid in sections
1567 views
105 files on 9 page(s)
1
2
3
4
5
6
7
8
9