Anson Engine Museum
Anson Engine Museum Gallery
Home
Login
Anson Engine Museum
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favorites
Search
Home
>
Archive photos of engines and museum views
>
Construction Work up to 2007
Most viewed - Construction Work up to 2007
getting to grips with the Campbell
2122 views
the engine had to be dismantled in the car park prior to its move to a new location
Trees being removed to widen the driveway
2037 views
prior to the move
2036 views
the engine had to be dismantled in the car park prior to its move to a new location
Trees down the drive need to be taken down to widen the area
2034 views
More stone ready for flattening
1922 views
One of the "Friends" of the museum, Jimmy Jackson donated money to allow us buy more stone for the car park.
Preparing the foundations
1903 views
Work on widening the drive and entrance area before new surface laid
1734 views
Another delivery of concrete for the floors arrives
1674 views
Campbell Engine being reassembled outside museum entrance
1674 views
The flywheel being lowered into place.
More stone waiting to be laid
1674 views
One of the "Friends" of the museum, Jimmy Jackson donated money to allow us buy more stone for the car park.
crank case being lifted off
1671 views
the engine had to be dismantled in the car park prior to its move to a new location
Another section of concrete goes down
1660 views
105 files on 9 page(s)
1
2
3
4
5
6
7
8
9