Construction Work up to 2007
|
|
|

Campbell Engine now in position outside museum entrance1549 viewsThe 40 ton Campbell has now been put back together as a gate guardian
|
|

Another delivery of concrete for the floors arrives1674 views
|
|

Trees down the drive need to be taken down to widen the area2034 views
|
|

Work on widening the drive and entrance area before new surface laid1735 views
|
|

Work on laying new surface on drive area1425 views
|
|

Outside shell goes up1559 views
|
|

New surface for drive entrance1559 views
|
|

Most of the buildings metal supports in place1438 views
|
|

Front wall brickwork going up1384 views
|
|

Blocks ready to be go in place1410 views
|
|

Work on bringing the steam engine building up to scratch1375 views
|
|

Front of steam engine building given a new look to match the new building1402 views
|
|
|